ANTAQ gives full authorization for DP World to fully its port facility in Santos
Apr, 29, 2020 Posted by datamarnewsWeek 202019
ANTAQ authorized DP World to fully operate the port facility TUP DP World Santos, located in Santos (SP). The Operation Release Term was published last Tuesday (April 28) in the Federal Official Gazette.
This gives authorization for the construction of 226.75m of the east quay and a mooring dolphin, concluding section 2 of the 447m quay planned for the berthing structures. This also allows for the integration of the previously authorized area of the pier with this area to form a total pier length of 1,100m. It is worth remembering that the authorization does not exempt the company from complying with the safety standards required for this operation, especially in relation to the Brazilian Navy, the Fire Department, and the environment agency.
-
Meat
Apr, 10, 2023
0
Brazilian gov’t announces end of Russian restrictions on beef exports
-
Other Cargo
Apr, 19, 2024
0
Brazil: Cotton Sees Growth in Production, Planted Area, and Exports
-
Economy
Jul, 29, 2022
0
DataLiner: Brazilian containerized imports and exports fall in June year-on-year
-
Ports and Terminals
Jul, 08, 2019
0
ADM in Brazil invests in terminal for the Port of Santos