Siemens Energy signs contract to supply thermal gas turbines at Porto do Açu
Nov, 23, 2021 Posted by Ruth HollardWeek 202145
Siemens Energy has signed a contract with Gás Natural Açu (GNA) to supply gas turbines for the GNA II plant, the second thermal plant at Porto do Açu, in the north of Rio de Janeiro.
The scope of the agreement provides for the delivery, by Siemens Energy, of the entire energy island, which consists of three high-efficiency gas turbines, one steam turbine, four electric generators, and three steam generators with heat recovery, in addition to instrumentation and control systems. The services offered by Siemens Energy will also cover the long-term operation and maintenance of the plant, including advanced remote monitoring.
After the second unit begins operations, the Açu complex will be the largest in Latin America in terms of thermal generation, with an installed capacity of 3 gigawatts (GW).
Source: Valor Econômico
To read the full original article, visit the link:
-
Ports and Terminals
Aug, 03, 2021
0
SP identifies Delta variant in crew of ship docked in Santos
-
Shipper/Freight Forwarders Rankings – commodity wise
Feb, 04, 2022
0
European freight forwarders turn liner operators
-
Other Logistics
May, 06, 2022
0
VLI’s Board of Directors will feature an independent position
-
Ports and Terminals
Aug, 01, 2019
0
Port of Santos profit jumps 15.6 times in the first semester